FISHPOND PROJECT DELAYED! Reality of Farming And Future Plans in Davao
Kumander Daot
•
February 9, 2022

Kumander Daot
View ChannelAbout
No channel description available.
Latest Posts
Upgrade Your Everyday
AI-recommended products based on this video
Loading...

Best Seller
Amazon Fire TV Stick HD (newest model), free and live TV, Alexa Voice Remote, smart home controls, HD streaming
(19,984)
$19.99
PrimeFREE delivery Wed, Jun 11 on $35 of items shipped by Amazon
10K+ bought in past month
Loading...

Apple AirPods 4 Wireless Earbuds, Bluetooth Headphones, Personalized Spatial Audio, Sweat and Water Resistant, USB-C Charging Case, H2 Chip, Up to 30 Hours of Battery Life, Effortless Setup for iPhone
(9,035)
$99.00$85.14
PrimeFREE delivery Wed, Jun 11
10K+ bought in past month
Loading...

Wireless Earbuds, Bluetooth 5.4 Headphones, True Wireless Stereo Earphones with IPX7 Waterproof, Noise Cancelling Mic, Fast Charging and Comfort Fit Ear Buds for Sports/Workouts - Black
(1,406)
$19.99
PrimeFREE delivery Sun, Jun 8 on $35 of items shipped by Amazon
Loading...

Wireless Earbuds Bluetooth Headphones, Ear Buds with Deep Bass, 40H Long Playtime, LED Power Display, IP7 in Ear Earphone with Mic for iPhone Android Phone Sports Workout, Black
(1,170)
$19.99
PrimeFREE delivery Sat, Jun 7 on $35 of items shipped by Amazon
10K+ bought in past month
Loading...

Best Seller
Apple AirPods Pro 2 Wireless Earbuds, Active Noise Cancellation, Hearing Aid Feature, Bluetooth Headphones, Transparency, Personalized Spatial Audio, High-Fidelity Sound, H2 Chip, USB-C Charging
(28,731)
$169.00$162.24
PrimeFREE delivery Wed, Jun 11
10K+ bought in past month
Loading...

Portable Charger Power Bank 56800mAh Battery Pack-22.5W Fast Charging with USB C & LED Display, 3 Outputs High Capacity Portable Power Bank for iPhone 16/15/14/13 Series, Samsung, iPad etc
(419)
$34.99
PrimeFREE delivery Mon, Jun 9 on $35 of items shipped by AmazonArrives before Father's Day
10K+ bought in past month
Loading...

Anker Portable Charger, 10,000mAh 30W Power Bank, USB-C in and Out Fast Charging Battery Pack, Travel Essential Phone Power Bank, for iPhone 16/15, iPad, MacBook, Galaxy, Google, and More ClimatePartner certified
(10,947)
$16.09
PrimeFREE delivery Wed, Jun 11 on $35 of items shipped by Amazon
10K+ bought in past month
Loading...

for Magsafe Battery Pack, 10000mAh Magnetic Portable Charger with USB C Cable 20W PD Fast Charging, Slim & Lightweight Wireless Power Bank for iPhone 16/15/14/13/12 Series
(1,148)
$22.99
PrimeFREE delivery Sun, Jun 8 on $35 of items shipped by Amazon
9K+ bought in past month
Loading...

Apple AirPods 4 Wireless Earbuds, Bluetooth Headphones, Personalized Spatial Audio, Sweat and Water Resistant, USB-C Charging Case, H2 Chip, Up to 30 Hours of Battery Life, Effortless Setup for iPhone
(9,035)
$99.00$85.14
PrimeFREE delivery Wed, Jun 11
10K+ bought in past month
Loading...

Wireless Earbuds Bluetooth Headphones, Ear Buds with Deep Bass, 40H Long Playtime, LED Power Display, IP7 in Ear Earphone with Mic for iPhone Android Phone Sports Workout, Black
(1,170)
$19.99
PrimeFREE delivery Sat, Jun 7 on $35 of items shipped by Amazon
10K+ bought in past month
Loading...

Best Seller
Apple AirPods Pro 2 Wireless Earbuds, Active Noise Cancellation, Hearing Aid Feature, Bluetooth Headphones, Transparency, Personalized Spatial Audio, High-Fidelity Sound, H2 Chip, USB-C Charging
(28,731)
$169.00$162.24
PrimeFREE delivery Wed, Jun 11
10K+ bought in past month
Loading...

Wireless Earbuds, Bluetooth 5.4 Headphones, True Wireless Stereo Earphones with IPX7 Waterproof, Noise Cancelling Mic, Fast Charging and Comfort Fit Ear Buds for Sports/Workouts - Black
(1,406)
$19.99
PrimeFREE delivery Sun, Jun 8 on $35 of items shipped by Amazon
Loading...

tomtoc 360° Protective Laptop Sleeve for 15-inch MacBook Air M4/A3241 2025, M3/A3114 2024, M2/A2941 2023, 15-inch MacBook Pro A1990 A1707, Dell XPS 15 Plus Laptop, Water-Resistant Computer Case Bag Global Recycled Standard
(23,744)
$24.54$23.99
PrimeFREE delivery Mon, Jun 2 on $35 of items shipped by Amazon
1K+ bought in past month
Loading...
![Ailun 3 Pack Privacy Screen Protector for iPhone 16 Pro Max [6.9 inch]+ 3 Pack Camera Lens Protector,Dynamic Island Compatible,Anti Spy Tempered Glass[9H Hardness]-HD](https://m.media-amazon.com/images/I/71JLo9DxMnL._AC_UL960_FMwebp_QL65_.jpg)
Best Seller
Ailun 3 Pack Privacy Screen Protector for iPhone 16 Pro Max [6.9 inch]+ 3 Pack Camera Lens Protector,Dynamic Island Compatible,Anti Spy Tempered Glass[9H Hardness]-HD
(112,482)
$8.98
PrimeFREE delivery Mon, Jun 9 on $35 of items shipped by Amazon
10K+ bought in past month