I Fixed The Biggest Problem with 3D Printed Water Cooling
Visual Thinker
@visual_thinker_ytAbout
My name is Gianni, and I’m an engineer with 10 years of experience in automation and design. Together with my wife, Judy Ann, an Architectural Designer, we specialize in DIY and tech-driven projects. Our unique blend of engineering expertise and creative vision allows us to take on exciting challenges and share them with you. We also create detailed, realistic renderings to simplify complex concepts, making our projects engaging and easy to follow for everyone.
Latest Posts
Video Description
Thank you to Brilliant for sponsoring this video! To learn for free on Brilliant, go to https://brilliant.org/VisualThinker/. You’ll also get 20% off an annual premium subscription. As I start to plan my next computer build, I want to gain the ability to make my own water cooling components, specifically Distro Plates. I don't have a CNC router, which is typically used to make parts like this, so lets find out what is possible with 3D printing and laser cutting! No generative AI was used in this video These are affiliate links, which provide us a small commission when used to purchase products. This adds no cost to you! M4 Taps : https://amzn.to/4aMD7el Pumps : https://amzn.to/3YptWco Plug Fitting : https://amzn.to/3MwtczE Acrylic Sheets : https://amzn.to/4av0p8L Platinum Silicone : https://amzn.to/4q8hV7e TPU Filament : https://amzn.to/44mM8a6 Plastic Syringe : https://amzn.to/3XTEujU Fluid Dye : https://amzn.to/3KWihyI Bambu Lab H2S Printer : https://tidd.ly/4oOufcb xTool P2S Laser Cutter : https://www.xtool.com/products/xtool-p2-55w-co2-laser-cutter?ref=qkqugrjl&utm_medium=affiliate&utm_source=goaffpro&utm_term=5306 xTool AP2 Filter: https://www.xtool.com/products/xtool-safetypro-ap2?_pos=4&_sid=58489d813&_ss=r&ref=qkqugrjl&utm_medium=affiliate&utm_source=goaffpro&utm_term=5306 0:00 Intro 1:22 The Idea 2:41 Channel Proof Of Concept 3:57 Pump Integration 5:17 Version 2 6:27 All-Acrylic Design 7:33 Sponsor 8:42 Demolding 9:15 A Larger Test 10:56 Injected Silicon 12:27 Full Scale Prototype 14:05 The Big Pour 15:40 Final Assembly 16:30 Reveal
Upgrade Your Everyday
AI-recommended products based on this video

Kasa Smart Outdoor Smart Plug by TP-Link (KP400) - Smart WiFi Outlet with 2 Sockets, IP64 Waterproof, Works with Alexa and Google Home, 2.4GHz WiFi Required, No Hub Required, Sunset & Sunrise Offset

Wireless Earbuds, Bluetooth 5.4 Headphones in Ear with 4 ENC Noise Cancelling Mic, in Ear Earphones 40H, IP7 Waterproof, Bluetooth Ear Buds for Sports, Gym, Workout, USB C, White

Wireless Earbuds, Bluetooth 5.4 Headphones in Ear with 4 ENC Noise Cancelling Mic, in Ear Earphones 40H, IP7 Waterproof, USB C, Bluetooth Ear Buds for Sports, Gym, Workout, Rose Pink

Wireless Earbuds, Bluetooth 5.4 Headphones in Ear with 4 ENC Noise Cancelling Mic, in Ear Earphones 40H, IP7 Waterproof, USB C, Bluetooth Ear Buds for Sports, Gym, Workout, Black

Fvyao Sleep Earbuds, Mini Wireless Earbuds in Ear, Sleep Headphones Design for Side Sleeper, 24H Bass Stereo, Bluetooth 5.4, with ENC Noise Cancelling, IPX6 Waterproof Ear Buds for Android iOS

Brita Stainless Steel Premium Filtering Water Bottle, BPA-Free, Reusable, Insulated, Replaces 300 Plastic Water Bottles, Filter Lasts 2 Months or 40 Gallons, Includes 1 Filter, Carbon - 20 oz.

Simple Modern Filtered Water Bottle | Insulated Stainless-Steel Carbon Filter Travel Water Bottles | Reusable for Clean Drinking Water On The Go | 24oz, Sea Glass Sage

Motivaris Fitness Tracker Health Watch, 1.47" Step Counter with 24/7 Heart Rate Blood Oxygen Sleep Monitor, 3ATM Waterproof Smart Watch for Women Men, Pedometer Black

FITVII Health & Fitness Tracker (Answer/Make Calls), Smart Watch with 24/7 Heart Rate and Blood Pressure, Sleep Tracking Monitor, 120+ Sport Mode Activity Tracker

AYATAHA AYATAHA Smart Watch for Kids, Smartwatch Fitness Tracker for Boys Girls, Children's Activity Watch 37 Sports Modes SMS Notification, HD Full Touchscreen IP67 Waterproof, Blue

Iaret Iaret Smart Watch for Women, 1.83" HD Fitness Tracker with 4 Bands, Answer/Make Calls, Heart Rate/Sleep/SpO2/Step Tracking, 100+ Sport Modes, Android/iPhone Compatible Gift (Rose Gold)

Hand Warmers 2 Pack, 14000mAh Rechargeable Hand Warmers, Electric Hand Warmer Reusable, Portable Power Bank USB Hand Warmers 4 Levels 8 Heating, Gifts for Raynauds Ski Golf Camping

Hand Warmers Rechargeable, 10000mAh Electric Heated Gloves Power Bank Portable Graphene Handwarmers Pouch with 3 Levels & Double-Sided Heating for Hunting Camping Golf Xmas Gifts for Women Men Kids

2Pack Rechargeable Hand Warmer, 8000mAh Electric Hand Warmer Power Bank, Portable USB-C Hand Warmer for Pocket, Reusable Hand Warmer Up to 8 hrs Each, Warm Gift for Men Women, for Hunting, Camping

GTOCE Portable Charger,40000mAh Power Bank with 22.5W Fast Charging LED Digital Display Battery Pack with 6 Outputs 2 Inputs, Type C Powerbank Portable Charger for iPhone 16 pro Samsung AirPods,Black

Monster Sleep Ear200, Wireless in-Ear Headphones, Bluetooth 6.0 Sleep Headphones, with ANC Active Noise Cancellation Designed for Side Sleepers, 30 Hours of bass Stereo Sound.

Fvyao Sleep Earbuds, Mini Wireless Earbuds in Ear, Sleep Headphones Design for Side Sleeper, 24H Bass Stereo, Bluetooth 5.4, with ENC Noise Cancelling, IPX6 Waterproof Ear Buds for Android iOS

Monster Sleep Ear100 Ear Buds, Sleep Earbuds with Stereo Sound, Design for Side Sleeper, 32H Playtime, Bluetooth 6.0, ENC Noise Cancelling, IPX6 Waterproof Mini Headphones, White

Monster Sleep Ear100 Ear Buds, Sleep Earbuds with Stereo Sound, Design for Side Sleeper, 32H Playtime, Bluetooth 6.0, ENC Noise Cancelling, IPX6 Waterproof Mini Headphones, Black

Hydroponics Growing System Indoor Garden - Herb Garden with Grow Light, 15 Pods Stainless Steel Indoor Garden Kit, Auto Timer, Gardening Gift for All Ages

Umbra Triflora Hanging Planter for Window, Indoor Herb Garden, Set of 5, White/Black

Large Hydroponics Growing System 14 Pods, Indoor Herb Garden with LED Grow Light, 5L Water Tank, Hydroponic Grow Kit with 3 Auto-Timers, Rotatable Light Panel and Child Lock for Home School Gardening

Hanging Planter Hanging Plant Holder, 6 Inch 4 Indoor Plant Pots, Wall/Window Plant Hanger Indoor Herb Garden

slopehill Multi Hair Stylers & Hair Straightener - 2 in 1 Wet to Dry Air Straightener and Hair Dryer Combo with High Speed Air + Rapid Heat-Up + Customizable Temperature(Pink)

Hi.FANCY Portable Laptop Stand with Dual Cooling Fans for 14-17inch Laptops, Grey, 23.5 x 25.9 x 0.95cm

Laptop Stand for Desk, Adjustable Laptop Riser ABS+Silicone Foldable Portable Laptop Holder, Ventilated Cooling Notebook Stand for 10-15.6” Laptops,Tablet-Black

JETech 5 in 1 Case for Samsung Galaxy S25 Ultra 5G with 2-Pack Each Tempered Glass Screen Protector and Camera Lens Protector, Non-Yellowing Shockproof Bumper Phone Cover (Clear)

TAURI for iPhone 17 Pro Max Case 6.9" with 1-Pack Screen Protector, Camera Lens Full Protection, Military-Grade Protection, Shockproof Transparent Back Bumper Phone Cover - Clear Global Recycled Standard

TAURI for iPhone 17 Pro Case 6.3" with 1-Pack Screen Protector, Camera Lens Full Protection, Military-Grade Protection, Shockproof Transparent Back Bumper Phone Cover - Clear Global Recycled Standard

JOINPAYA 1Set Rechargeable Hand Warmer Hand Heater for Winter Heating Levels Compact

Shakven Rechargeable Hand Warmer | Cute Comfortable Portable Hand Warmers,Ergonomic Adjustable Energy-Efficient Small Heater for Travel, Outdoor, Winter

OCOOPA IP45 Waterproof Hand Warmer Rechargeable, Up to 15hrs Heat,10000mAh Durable Quick Charge Electric Hand Heater, PD Compatible, 3 Levels for Outdoors, Heavy Duty, H01-PD PRO












